Bow Thruster Tunnel Repair

Problem

Deep pitting on the bow thruster tunnel due to cavitation.

Industry

Marine

Application Date

2024

Location

Ontario / Canada

Equipment Application

SOS-Ships and Offshore Structures

Subtrate

Other

Product

Belzona 1311 (Ceramic R-Metal)
Belzona 1321 (Ceramic S-Metal)
Belzona 9111 (Cleaner Degreaser)

Repair Stages

Application Situation

Customer requested for a quick turnaround of the repair.

Application Method

Surface preparation was carried out using the MBX bristle blaster, degreased and allowed to dry. Pitting was filled with Belzona 1311 and two coats of Belzona 1321 was applied.

Belzona Facts

Customer was satisfied with application as this reduced downtime.