The plant was not able to shut down the system so a solution for a live leak was requested and the end user and contractor knew Belzona would have a solution and the products for the application. The cost was under $3,000.00 for the repair that saved the plant from shutting down the system that would have cost hundreds of thousands of dollars 2/3 weeks of down time.
Application Method
Heavy rust was removed by a tapping the pipe with a hammer and than the preparation was completed using pneumatic air hand tooling, needle gun and grinder.
Belzona Facts
Belzona was chosen for the both the end user and contractor have used many Belzona products over the years and have great success and long term results.
Contact your nearest Belzona Consultant and schedule a free evaluation!
The secondary clarifiers at the Water Pollution Control Center were pitted and deteriorated due to chemical attack from the biological treatment process.
The centrifuge was suffering from erosion-corrosion and scale buildup. They needed a product that would protect the equipment but also help reduce the buildup and improve the efficiency of the equipment