Customer had a new pump and wanted to protect it before putting it in service to aid better longevity.
Industry
Facilities Maintenance
Application Date
2023
Location
Ontario / Canada
Equipment Application
PDP-Positive Displacement Pumps
Subtrate
Cast Iron
Product
Belzona 1321 (Ceramic S-Metal)
Repair Stages
Application Situation
Customer bought a new flygt pump and decided to protect it before putting it in service. This preventive maintenance was possible due to customers’ previous experience of high performance and improved efficiency of equipment with Belzona products.
Application Method
Pump was grit blasted to standard SSPC SP5 and coated with Belzona 1321.
Belzona Facts
Belzona high performance protection and improvement of efficiency in equipment convinced customer to coat pump before installation.
Contact your nearest Belzona Consultant and schedule a free evaluation!
The secondary clarifiers at the Water Pollution Control Center were pitted and deteriorated due to chemical attack from the biological treatment process.
The centrifuge was suffering from erosion-corrosion and scale buildup. They needed a product that would protect the equipment but also help reduce the buildup and improve the efficiency of the equipment