CASE

Belzona Helps Rebuild End Cooler Headers

Problem

Severe pitting, corrosion appeared on the covers after years of operation. The worst of the pitting was about 8mm deep.

Industry

Water & Wastewater Management

Application Date

2018

Location

Ontario / Canada

Equipment Application

CEP-Centrifugal Pumps

Subtrate

Cast Iron

Product

Belzona 1511 (Super HT-Metal)

Repair Stages

Application Situation

End cooler headers of a tube sheet. Design temperature: 200F.

Application Method

Application was carried out in accordance with Belzona Know-How System Leaflets CEP-5 & FBC-5. Belzona 1511 was used to rebuild the entire profile of the inside of the cooler heads.

Belzona Facts

The water collectors originally had no lining and were severely damaged after years of service. The Belzona solution restored the equipment thickness, preventing future corrosion and extending the useful life of the equipment. Manufacturing replacement heads would take over a year; however, with the use of Belzona they repaired the equipment and returned to service after a couple of weeks avoiding prolonged downtime.