CASE

Concrete Stairs Saved from Further Dilapidation

Problem

Stairs was experiencing cracks along the railing pillar and was on the verge of falling apart.

Industry

Facilities Maintenance

Application Date

2014

Location

Ontario / Canada

Equipment Application

FPA-Floor Problem Areas

Subtrate

Concrete

Product

Belzona 4111 (Magma-Quartz)

Repair Stages

Application Situation

Concrete stairs was on the verge of falling apart due to stress from the railings and customer wanted a fast repair that would enable the area opened to the public in the fastest way.

Application Method

The weak parts of the concrete stairs was removed and vacuumed. The areas were subsequently rebuilt with Belzona 4111.

Belzona Facts

Belzona repair was carried out and the area opened to for public use in matter of days.

Contact your nearest Belzona Consultant and schedule a free evaluation!

Other Cases

Internal Coating for Centrifugal Pump

A customer wanted to protect and expand the life of a new pump due to installed at the plant to replace the existing pump which was suffering from corrosion/erosion due to sewage waste.